The view of San Salvador and our project.

The view of San Salvador and our project.
Taken from our local architect's home. The Temple is 1 inch to the right of the tall apartment building in the center of the photo. Look for the orange tower structure.

Thursday, April 23, 2009

This is photo of our construction site from the top of the building called the Pedregal. It is under construction and the contractor that is building our temple is also the contractor on this building. He was able to get permission for us to take photos a couple times month. This building is 18 stories right now and will be 24 when completed. Jim climbed to the top on the scaffolding stairs in the photo below.

The Pedregal building across the street from our construction site.

Jim in the storm drain box. Ready for the "rains" which are due in May. This box will collect the rain water and disperse it slowly into the city storm drains. They say this box will only hold 1 rainfall. When it rains it pours. It has only rained once since we arrived. So it's dry for 6 months and wet for 6 months. 2 seasons only in El Salvador. The fincas, or coffee plantations are "crying for rain". Within a week of the first rain they will burst into bloom. The air will be filled with a lovely floral scent.




This is some of the rebar that is used in our construction. It is really huge. It took three men to bend it into the form. The joke is a teaspoon is used to put concrete around the rebar. This rebar fabrication is necessary because of the earthquakes.
Posted by Picasa

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.

Elder and Hermana Fenn

Elder and Hermana Fenn
10 Nov 2008 MTC

Self portrait

Self portrait
On site with our "cascos" on. Mine is pink.

Our Backyard

Our Backyard
We chose the casita for the garden